A new polypropylene (PP) pretreatment tunnel left our workshop in Meulebeke, bound for France. It was one of many projects in a busy summer.
At a glance
- Installation
- Polypropylene (PP) pretreatment tunnel
- Destination
- France
- Built in
- Our own workshop, Meulebeke (BE)
- Departure
- July 2026

Sustainable by design
PP pretreatment is a key part of how ESTEE builds sustainable powder coating lines. Together with hybrid ovens and heat recovery, it ensures minimal energy, powder and water consumption from day one. Read more about our approach to sustainability.
Built in-house
Like all our pretreatment tunnels, this one was designed and built entirely in our own workshop. After transport, our own team installs it at the customer’s site. Durable, efficient installations, built to last.
More about our powder coating installations.
This news first appeared on LinkedIn. View the original post.
A similar project in mind?
Tell us about your plans. We will visit you, free of obligation, and think along with you.


