ESTEE Coating Solutions

Built to last

References across Europe

More than 500 installations across Europe — from compact starter lines to fully automated plants. A selection of recent projects and partners below.

On LinkedIn

New realisations, every week

Nieuwe poederlakfabriek van NanoMetal in Kosovo
Project · Kosovo

NanoMetal: ESTEE is general contractor for a new powder coating plant

As general contractor, ESTEE delivers the complete installation, from pretreatment to application. Construction starts in October 2026, opening in 2027.

Nieuwe ESTEE-poederlaklijn voor sandwichpanelen in Midden-Duitsland
Project · Sandwich panels

New powder coating line for sandwich panels running in Central Germany

Already the third ESTEE line for this application: fully automated coating, consistent film thickness over long surfaces and a powder booth built to measure.

Gebouw van ESTEE Coating Solutions
News · Network

ESTEE joins ION

Since June 2026, ESTEE has been a member of the Dutch association for industrial surface treatment. ION visited us for a tour of our workshop.

PP-voorbehandelingstunnel op transport naar Frankrijk
Project · Pretreatment

PP pretreatment tunnel on its way to France

Another polypropylene pretreatment tunnel left our workshop, built entirely in-house. One of many projects in a busy summer.

Nieuwe poederlakinstallatie bij SaBimetal Poedercoating
Project · Belgium

G&D Construct starts its own job coating company and chooses ESTEE again

For SaBimetal Poedercoating, ESTEE delivered a complete line: an 11 × 5 × 5 m curing oven, a powder booth with horizontal extraction and a transfer system.

Voorbehandelingstunnel in aanbouw in het ESTEE-atelier
Workshop

Built in-house. Built to last.

From pretreatment tunnels to spray booths and ovens: we design and build every part ourselves. Full control, from first design to final weld.

Gebouw van partner TRIAB in Zweden
Partnership · Sweden

Stronger in Scandinavia with partner TRIAB

TRIAB is a benchmark in powder coating of non-metallics, a perfect complement to ESTEE's complete installations. A visit to Sweden confirmed the partnership.

Ovenretrofit service — ESTEE
Project

Van Merksteijn: −35% energy, heat-up 2 h → 30 min

A complete oven modernisation: five new burner chambers and a new reinforced air distribution floor, with a much more uniform temperature.

Elektrische kasten poederlaklijn — ESTEE
Service

One ESTEE visit, your entire line in good hands.

A G2-certified ESTEE technician checks the entire installation in a single maintenance visit. One customer saved €500 on the final invoice.

Hybride oven gas/elektrisch — ESTEE
Innovation · Energy

Turn negative electricity prices into an advantage

In 2024, Europe saw 458 hours of negative electricity prices. ESTEE hybrid ovens switch to electric exactly when it pays off.

Project · Netherlands

Wagner systemen: custom automatic powder booth

For partner Wagner systemen in the Netherlands, ESTEE built a custom automatic booth in double-walled PVC, with cyclone, Donaldson filter and extinguishing system.

Project · France

P.I.B. (Raismes): manual powder coating installation

For P.I.B. in Raismes (FR), ESTEE built a manual installation for parts up to 6.5 m, with a booth with horizontal extraction and a box oven.

Project · Belgium & France

CNH Industrial: new booths in Zedelgem and Croix

For CNH Industrial, ESTEE built a new manual booth in Zedelgem and converted a wet paint booth into a powder booth in Croix, in just 3 weeks.

Project · France

SILAC: two Wagner IPS systems with 24 guns

ESTEE installed two Wagner IPS powder centres with 24 guns on vertical lines at SILAC: the first during the Christmas holidays, the second in summer 2023.

Project · Belgium

Skylux: a new standard in Belgium

For Skylux in Harelbeke, ESTEE built a large line with 100% electric ovens, Step&Go PP pretreatment to Qualicoat standards, Wagner PXS and UNICoater.

Project · Aluminium

High-end line for aluminium profiles in Haute-Saône

In Haute-Saône (FR), ESTEE built a line for aluminium profiles: PP pretreatment to Qualimarine standards, 100% electric ovens and UNICoater.

Project · France

Steelhy: manual line for parts up to 6 metres

For Steelhy near Grenoble, ESTEE built a manual line for workpieces up to 6 × 1 × 2.5 m, with a PPs booth, Wagner Sprint units, curing oven and sandblasting booth.

Knowledge · Energy

Measuring is knowing: how data saves energy

Three practical cases from UNICoater data: 81.8% more gas from open oven doors, 26% savings with energy recovery and a drying oven using more than the curing oven.

Project · Germany

NanoCoat: on the cover of Besser Lackieren

For NanoCoat in Lüdinghausen, ESTEE built a line with PP pretreatment, hybrid ovens and UNICoater. The project made the cover of Besser Lackieren.

Project · France

Pulsion Alu: a 33-metre pretreatment tunnel

For Pulsion Alu, ESTEE designed a powder coating line with a 33 m chemical pretreatment tunnel for aluminium gates up to 14 m long, with zero liquid discharge.

Project · Belgium

Maes Coating Service: the new manual ESTEE booth

At Maes Coating Service, ESTEE introduced its new manual booth with horizontal extraction: less energy, longer filter life and 750 lux.

Project · Belgium

Renson: 170 m tunnel, XXL ovens and two Wagner IPS

For Renson, ESTEE built a complete powder coating installation: a 170 m pretreatment tunnel, ovens with energy recovery and two Wagner IPS coating centres.

Project · France

Berry Epoxy: one automatic and one manual line

For Berry Epoxy in La Châtre (FR), ESTEE delivered an automatic line with a Wagner PXE powder centre and a manual line with a box oven.

Project · Automotive

High-end powder coating line for automotive parts

A high-end line for automotive parts: 6-stage stainless steel pretreatment, 100% electric ovens and an automatic booth with 100% powder recovery.

Project · France

Promerac: already the fourth ESTEE installation

For Promerac in Bailleul (FR), ESTEE built a manual line for 6 m beams: a sandblasting booth, a booth with horizontal extraction and a curing oven.

Service

ESTEE Diagnosis Report: an objective view of your installation

With the ESTEE Diagnosis Report, an expert checks your installation on 32 objective points. You receive a clear report with recommendations to avoid downtime.

Project · Belgium

PMC Bruges: full control with its own line

PMC Bruges, part of the Pattyn Group, coats in-house with a custom ESTEE installation, with recovery of solar energy and support during start-up.

Project · Belgium

Trafiroad: one flexible line instead of five booths

After almost 40 years, Trafiroad's powder coating installation made way for a custom ESTEE line with automatic colour change, fitted into the existing hall.

Project · Belgium

VMT now powder coats in-house

Industrial supplier VMT invested in its own ESTEE powder coating installation, developed entirely around its objectives. The result: much shorter delivery times.

Videos

Real installations, real results

Multilaque — vertical line with ESTEE IPS application · Le Mans FR

Hoeflon — high-end pretreatment baths

Groupe Le Triangle — powder coating line for solar panel structures · FR

Aixam — installation · FR

Vrolijk Staalconcepten · NL

Skylux — powder coating line · BE

ESTEE IPS on a vertical line

Carmetal — multi-axis robot · Lyon FR

Jonkman Coating — powder coating line · NL

Renson — powder coating installation · BE

ESTEE & PMC

ESTEE Coating Solutions — corporate video

Shorts

Powder coating sandwich panels

Powder coating 24 m steel beams

Dynamic 3D coating solution

Automated cassette system

Bath series with automatic overhead crane

Manual coating of complex 3D parts in a booth with vertical extraction

New booths at Goma BV · NL

Cylinders coated red

Client references

Trusted across Europe

From single manual lines to the largest automated installations in Europe.

Aluminium

Steel

Job coaters

Featured references

Three installations in detail

Featured reference

Lüdinghausen, Germany · €2.5M · operational since 2023

  • First PP pretreatment tunnel in Germany 
  • Hybrid ovens — electricity or propane, hydrogen-ready
  • Double-gate airlock — minimal temperature drop
  • Heat cascade — curing-oven waste heat feeds drying oven (95°C) and pretreatment baths
  • UNICoater — full digitisation, remote control via smartphone

Result: after one year — fully booked, two-shift, 15 employees, storage expanded twice.

Featured reference

Contour Covering Technology

Winterswijk, Netherlands · medical & semiconductor

  • Full replacement of 35-year-old ovens in one month (mid-Dec 2023 → 1 Feb 2024)
  • Hybrid — 100% gas or 100% electric, infinitely adjustable
  • A-cap airlock at curing-oven entry; heat exchange between ovens and workpieces; extremely flat oven curve

Results: gas cut by a factor of 20; 200°C → 180°C; solar expansion → 100% electric, zero-emission.

Featured reference

Van Merksteijn Fences

Almelo, Netherlands · oven modernisation

  • Five new high-efficiency burner chambers + new reinforced air-distribution floor
  • All airlocks renewed + electrical modifications

Results: burner capacity −30–40%; heat-up time 2h → 30min; far more uniform temperature.

Ready to build something better?

Can we assist in your plans? Tell us about your project — no commitment, just honest expert advice.

ESTEE Service

Support over the entire lifetime of your line

Preventive maintenance

Structured plans that keep your line at peak performance.

Operator training

Theoretical and practical — reaching target output fast.

Spare parts stock

Extensive availability for fast repairs, minimal stops.

Remote diagnostics

UNICoater IoT enables monitoring and early warning.

Service contracts

Flexible agreements tailored to your line.

Pin It on Pinterest

Scroll to Top